Pistachio waste to activated carbon treatment at TDP-2-200 pyrolysis plant. VIDEO!
Section: NewsA pilot test was carried out on pistachio waste treatment into a commercial-grade product — activated carbon at continuous pyrolysis plant TDP-2-200. The final product was produced in two stages: firstly, the nutshells were fed into TDP-2-200 for treatment; secondly, the treated product, the carbon residue, was activated.
Enjoy watching the video highlighted the pistachio waste processing at TDP-2-200!