Request a call

Your name

Phone

The best time for a call?

TDP-2 for drilling waste treatment increases capacity

Section: News

Highly Watered Drilling Cuttings treatmentAn active exploitation of the Kuyumbinskoe oil and gas condensate deposit is accompanied by increasing of residual formation. IPEC company experts have developed technology for the purpose of technological process optimization and increasing of the Complex overall performance.

The Pyrolysis Plant TDP-2-800 utilizes preliminary exposed to partial dehydration highly watered drilling waste. The capacity of the modernized equipment is increased 2.5 times and reaches up to 15 cubes per day.

Compliance with the principles of the pit-free drilling allows not only to recover the waste, but also to obtain a technical soil, which is an eligible market product.